RTGS DNC Setup Solution using IBM MQ and IBM Sterling Connect:Direct

RTGS Dual Network Channel Setup Schedule

Option 1 – DQM: IBM MQ

Option 2 – STP: IBM Sterling Connect:Direct

—————————————————————

Member Test:  1-June 2026 to 17-July 2026

Simulation Test:  20-July 2026 to 9-Oct 2026

Production Launch: Nov 2026