RTGS Dual Network Channel Setup Schedule
Option 1 – DQM: IBM MQ
Option 2 – STP: IBM Sterling Connect:Direct
—————————————————————
Member Test: 1-June 2026 to 17-July 2026
Simulation Test: 20-July 2026 to 9-Oct 2026
Production Launch: Nov 2026